The process

A beautiful surface
starts beneath.

The final effect comes from craftsmanship. Its quality also depends on preparation, compatibility between layers and the correct application times.

01 / 06

Understand the space

We establish the desired effect and actual conditions: wall or floor, indoors or outdoors, light, area and exposure to water.

02 / 06

Assess the base

We assess the existing substrate, adhesion, moisture, cracks, joints and junctions. This determines what can be achieved.

03 / 06

Approve a sample

We refine colour, grain, pattern and sheen. The approved sample becomes the reference, allowing for the natural variation of hand-applied work.

04 / 06

Prepare the substrate

Surrounding areas are protected, followed by the preparation, levelling, primers and reinforcement specified for the system.

05 / 06

Build up the layers

The finish is built through layers and technique, following the sequence and intervals required by the chosen system.

06 / 06

Protect and hand over

The specified protection is completed, the surface is checked, and guidance is provided on when it can be used and how to clean and maintain it.

Beneath the surface

The finish is just
the final part.

The base, preparation and protection all contribute to the result. Explore an example build-up for each substrate.

Decorative plaster on a prepared wall

Render, plasterboard or existing paint: first assess the wall's condition, then define the finish.

Layers: Interior wallLayers shown together as a slab with exposed material bands, from substrate to protection. Select a layer to separate it from the stack; select it again to return it.010203040506
Click to separate a layer. Click again to return it.
Illustrative textures · Thicknesses not to scale

From substrate to finished surface

Complete build-up

From substrate to finish

The layers form one complete finish. Select a stage in the diagram or list to explore it.

Illustrative build-up. Application order, reinforcement, thicknesses and drying times are specified after substrate assessment and according to the selected system. Wet areas require dedicated waterproofing and junction details.

Renovation

Different substrates.
Different preparation.

The first step is to understand the existing surface and whether it is ready to receive a finish, before selecting a primer.

Existing surfaceWhat we assess
Render or paintCohesion, adhesion, absorption and any loose or incompatible areas that need removal.
PlasterboardJoint treatment, fixing, flatness and board preparation.
Concrete or screedDrying, moisture, cracks, joints, flatness and intended use.
Existing tilesTile adhesion, joints, unevenness and the possibility of overlaying without compromising levels and junction details.

Timing & investment

Cost the complete system.
Beyond the final layer.

Surface area is only one part of the quote.

Substrate condition, preparation, heights, access, relief, detailing and protection all affect the work. Drying and curing times vary with the system and site conditions; photographs alone cannot establish a reliable schedule.

01Before application

Approve the sample, prepare the substrates and coordinate the work with other trades.

02During application

Allow the required intervals between stages and plan continuous areas to manage stop marks.

03Before use

Allow the specified curing period and follow the conditions for use, especially for floors and wet areas.

Aftercare

Care for the surface.
Preserve the finish.

Cleaning instructions accompany the applied system. Washability and suitable products depend on the finish and its protection; an unprotected matt surface requires different care from a sealed finish.

If damage occurs, we assess whether a local repair is possible. Texture, colour and light may make a repair visible, so each case needs individual assessment.

Request a quote